How to Price Plumbing Jobs So Every Job Makes Money

Plumber tightening a fitting on a copper water line

To price plumbing jobs, start with what an hour of a plumber’s time really costs you, not what you pay per hour. Add up wages, payroll taxes, insurance, benefits and the truck, divide by the hours you actually bill, then add your share of overhead and the profit you want. Price from that number, whether you quote flat rate or time and materials, and check every job against its estimate once it’s done.

The wage is only part of the cost of each billable hour. A price that covers the wage but not the rest can lose money on every call, while the schedule looks full and the company looks busy.

Step 1: Find your true cost per billable hour

Start with everything you spend to keep one plumber working for a year:

  • Wages, including overtime
  • Payroll taxes: Social Security and Medicare alone are 7.65% of wages for the employer, according to the IRS, plus federal and state unemployment
  • Workers’ comp and liability insurance
  • Health insurance and other benefits
  • The truck: payment or lease, fuel, insurance and repairs
  • Tools, phones and training

Then divide by billable hours, not paid hours. A plumber paid for 2,080 hours a year doesn’t bill 2,080. Drive time, supply house runs, shop time, callbacks, training and holidays all come out. Your timesheets and invoices tell you the real share for your company.

Step 2: Add overhead and profit

Overhead is everything that isn’t tied to a job: the office, the dispatcher, software, rent, marketing, accounting, interest, and your own salary if it isn’t in job costs. Spread it over the same billable hours. Then add the profit you want as its own line in the price.

A worked example

Here’s a simple example with round numbers. Say one plumber costs you $110,000 a year in wages, payroll taxes, insurance and benefits, and the truck, tools and phone add $20,000, for $130,000 in all. If that plumber bills 1,400 hours a year, each billable hour costs about $93. Add $45 an hour of overhead and you break even at about $138 an hour. For a 20% margin, divide by 0.8: about $172 an hour.

LinePer billable hour
Plumber, truck and tools ($130,000 ÷ 1,400 hours)$93
Overhead$45
Break-even rate$138
Price for a 20% margin ($138 ÷ 0.8)$172

That $172 is the floor for time and materials work and the starting point for every flat rate price in your book.

Markup vs margin: the mistake that costs the most

A 20% markup is not a 20% margin. Markup is added to cost, and margin is measured against the price. Add 20% to the $138 break-even and you charge about $166, which is a margin of about 17%. To hit a target margin, divide cost by one minus the margin, as in the example. Our construction profit margin guide has a table of markups and the margins they produce.

Mark up materials too. Parts cost more than the supply house invoice: buying, stocking, the inventory riding on every truck, and the parts that never make it onto a bill. Compare what you buy with what you invoice each month. The gap is margin you’re giving away.

Flat rate or time and materials?

Flat rate pricing gives the customer one number up front from your price book, and it rewards fast, skilled plumbers. Its risk is a task that takes longer than the book assumes, so the book has to be built from your cost per billable hour and checked against real job times.

Time and materials is simpler to set up and safer on work you can’t see until you open a wall, like old buildings and hidden leaks. Customers push back on open-ended bills, though, so give a range before you start.

You can use both: flat rate for common service calls, and time and materials or a fixed bid for remodels and new construction. Whichever you use, the cost per billable hour underneath is the same.

Bids on remodels and new construction

Larger jobs are estimated, not priced from a book. Build the estimate from labor hours by phase, materials with your markup, any subcontractors and equipment, permits, then overhead and profit. Then hold the job to it: track hours and materials against the estimate every week, bill change orders as they happen, and plan for retainage, which holds back part of each payment until the end. A WIP schedule shows which jobs are slipping while there’s still time to act, and our guide to cash flow vs profit shows why retainage can leave a profitable job short of cash.

Check every job against its estimate

A price only stays right if you compare it with what jobs really cost. Job costing does that. Every job and service ticket gets its labor, materials and equipment, and each month you compare the result with the estimate. The jobs that miss tell you where your prices are wrong.

We saw this with a New York general contractor that has worked with us for about 15 years. Jobs it expected to make a certain margin often made less. Once job schedules showed where the costs went, it changed how it estimates, and revenue grew from about $4 million a year to a record $30 million in 2025. It isn’t a plumbing company, but plumbing jobs miss their estimates the same way. Read the full story.

When raising prices isn’t the fix

Sometimes the price is fine and the money leaks somewhere else: parts that never get billed, invoices that go out weeks late, callbacks you don’t charge for, or paid hours that never reach a job. Check those first. A price increase won’t fix them, and your customers will notice it.

How we help

We work out your real cost per billable hour, set up job costing on every job and service ticket, and report profit by service line every month, so your prices and your price book come from your own numbers. See our accounting for plumbers and our work with other home service companies.

FAQs

How much should a plumber charge per hour?

Enough to cover your full cost per billable hour, your overhead per billable hour and your profit. That number is different for every company, because wages, insurance, overhead and billable hours all differ, so work it out from your own books rather than copying a competitor’s rate.

What markup should plumbers use on materials?

There’s no single right number. Your markup has to cover what parts cost you to buy, stock and carry on the truck, plus the parts that never get billed. Compare what you buy with what you invoice each month to see the markup you really earn.

Is flat rate pricing better than time and materials?

Flat rate works well for common service tasks you can time reliably, and customers like a price up front. Time and materials is safer when you can’t see the problem until the work starts. Both need the same cost per billable hour underneath.

What’s the difference between markup and margin?

Markup is a percentage of cost, and margin is a percentage of the price. A 20% markup on $100 of cost gives a $120 price, which is a margin of about 16.7%.

How often should a plumbing company review its prices?

Compare job results with estimates every month, and recalculate the hourly cost behind your prices at least once a year, or sooner when wages, insurance or fuel jump.

Facebook
Twitter
LinkedIn
WhatsApp
Picture of Alan G. Lefkowitz, CPA
Alan G. Lefkowitz, CPA

Alan G. Lefkowitz, CPA, founded CFO Strategies in 2009 and has 46 years of business experience across financial services, construction and real estate. He spent more than 10 years as CFO of mid-sized construction and real estate companies, overseeing the finances of major New York projects including the Yankee Stadium and the Goldman Sachs office tower.